AVONLEA BRIDGE UPDATE


PROJECT INFORMATION:

The $1.7 million project is funded by the Road Commission for Oakland County.

The project includes:

The removal of the existing twin corrugated metal pipe 7'-11" span by 5' 7" rise arches.

Replacing with a 23-foot-span-by-5-foot-rise, pile-supported, precast, three-sided culvert.

New headwalls and wingwalls.

Asphalt resurfacing in the vicinity of the bridge.

New guardrails.

Utility relocations. 

Timeline/contractor:

START DATE: August 17, 2026

EXPECTED COMPLETION: Late November